The refurbishment and upgrading of Deep Water Quay will result in:• No. of operational general cargo berths in the Port of Valletta: 4 berths• Increase of displacement capacity of DWQ berths to handle ships of: 40,000 Tonnes• Increase of DWQ deck loading capacity at Areas A and D to: 5 Metric Tonnes/sq.m• Increase of DWQ deck loading capacity in Area B to: 4 Metric Tonnes/sq.m• Increase in satisfaction rate of transport operators/port users (amount to be determined through customer satisfaction surveys to be carried out both before – baseline - and after completion of the project) 10%• Increase in cargo per annum (based on 2004 TEU baseline tonnage of 878,726 for the port of Valletta)