WSC is seeking to construct a sewage transfer system to connect the Baħrija system to the main sewage system at Rabat so as to eliminate the continual transfer of sewage by bowser. It is also seeking to upgrade part of the sewage network at Rabat where the new transfer system would connect to the network to enable this part of the system to meet current demands.The objectives of the project are:To change the transportation method of around 65m3 of wastewater generated daily in the village of Baħrija from a vehicle based system to a piped system;To include the hamlets of Bieb ir-Ruwa and Għajn Qajjet on the same system;To upgrade the wastewater collection system in the Rabat around the area where the Baħrija transfer system would be connecting to the main network.Environmental Objectives:Through this project the WSC is seeking to reduce its carbon footprint, by changing from waste water transport via vehicle in favour of transfer by pipeline. This would subsitute away the use of fuel in transporation of wastewater to electricity;Elimination of the impact (visual and associated odours) of transporting wastewater by bowser, particularly at the point of extraction and the point of discharge;Elimination of localised inconveniences caused by overloaded sewers in the Rabat area, and elimination of sewage overflows into the valley in Rabat which is also effecting areas down to Attard.